Nigeria · the building, the people, the stage
Protect the building you must put back.
Find the right building routeAn occupied home, a let property and a construction site do not ask the same insurance question. First identify who owns or occupies the structure, when the risk arises and whether you need repair cover, third-party liability, or both.
Published Nigeria buildings editorial edition · source research checked 10 October 2026. This page takes no address, plan, valuation, identity document or claim file; it is not a quote or binding policy.
Start with the risk at this address
Three lanes that should not be merged.
Whose repair bill?
The owner usually needs to test the walls, roof and fixed services against selected damage events. A tenant’s furniture is a different interest; contents do not become the landlord’s building.
Who could be harmed?
Tenant, lodger, business and public-access use may bring the public-building rule into view. Ask for a certificate addressing statutory hazards and owner/occupier legal liability, as well as any own-building repair cover.
Who carries site liability?
For a building of more than one floor, Nigerian law addresses negligence-related injury or death at the construction stage. A contractor’s-all-risks damage section is another question; occupation may require a new policy.

Nigeria Insurance Industry Reform Act 2025 · sections 75 and 76
Compulsory liability is not a blanket home-rebuild promise.
The official NIIRA 2025 text sets different triggers. Section 75 concerns construction of a building of more than one floor: the owner or contractor must procure liability insurance immediately after building-plan approval and before construction for negligence-related bodily injury or death to site workers or the public. It does not, by itself, insure the cost of damaged works.
Section 76 concerns a public building. Its definition includes a tenement house of more than one floor, a hostel, a building occupied by a tenant, lodger or licensee, and public-access education, medical, recreation or business premises. The Act names collapse, fire, earthquake, storm and flood hazards and requires legal-liability cover for users and third parties. That does not mean every owner-occupied private home must buy the same compulsory policy or that every repair bill is paid.
| Building situation | What to establish | Separate cover question |
|---|---|---|
| Owner-occupied home | Owner, address, occupancy, structure value and selected damage events. | Do not infer compulsory public-building cover solely from owning a home; ask how building repair, contents and liability are scheduled. |
| Let or public-use building | Whether section 76 applies to this tenancy, lodging or public use; named hazards and owner/occupier liability. | Ask the issuer and competent authority for the required certificate and whether an own-building reinstatement section is also selected. |
| More-than-one-floor construction | Section 75 negligence liability from building-plan approval, before works begin; owner/contractor responsibility. | Insuring the works, materials, plant, contract delay or later occupation needs distinct written terms. |
The Act and a regulator directory are legal starting points, not a certificate for your address. Confirm building classification and current implementation with a qualified local adviser, approving authority and insurer.
Ten Nigerian insurer sites · source-bound research
Ten building or householder descriptions; zero accepted comparable policies.
These ten insurer-owned routes establish market signals, not a ten-policy shopping panel. A householder package, a fire-perils policy, a tier and a commercial property wording cannot be swapped as if they insure the same building. Each source links to the insurer’s own description; an offer still needs the legal issuer, exact risk, selected sections, exclusions, limits, excess and dated NGN price.
| Insurer-owned route | What its page establishes | What remains unverified |
|---|---|---|
| Leadway Assurance company homepage | One insurer’s homeowner and landlord level tables show building sums from ₦50m to ₦350m. | Five levels in each table are not ten insurers or accepted policies. Occupancy, events, excess and actual schedule must be matched; tenant levels do not list a building sum. |
| NEM Insurance Plc company homepage | Names homes and rented property alongside shops/warehouses, and multiple property hazards. | Which perils, premises, values and excess apply to a particular home; commercial examples do not become residential terms. |
| AXA Mansard company homepage | Describes Householders with a Fire & Allied building/contents section and a separate Fire and Special Perils route. | Selected sections and whether flood, riot or water extensions apply; several sections are not several issued contracts. |
| Cornerstone Insurance company homepage | Separates building and contents; describes alternative accommodation and rent only in relation to an insured building. | Accepted premises, damage events, limits, valuation and current price. Its own form asks for personal details; this page sends none. |
| Prestige Assurance company homepage | One ten-section package describes building Fire & Allied Section I and compulsory contents Section IB. | At least three sections must be selected; ten sections are not ten policies, and a building section should not be assumed selected. |
| Sovereign Trust company homepage | Names building, personal effects and jewellery and asks for replacement-cost information. | A quoted rebuild sum, peril schedule and liability selection. Its ₦200k optional personal-liability figure is not a building limit. |
| Coronation Life Assurance Limited company homepage | Distinguishes Home Owner building/fire/flood from House Holder belongings. | Which Nigerian legal insurer issues selected cover and which benefits survive in the written offer. The separate institutional buildings page is business-oriented. |
| LASACO company homepage | Names residential building or contents and fire/lightning/domestic-gas explosion, with inventory and proposal requirements. | The page also mixes business-continuity and three-instalment benefit copy. Ask which clauses genuinely attach to a home contract. |
| Guinea Insurance company homepage | Names building, fixtures, contents and events including flood and burst pipes. | The household page includes business-interruption text; an issued personal wording must resolve the mixed copy and actual selected events. |
| Anchor Insurance company homepage | Its product index names residential building and/or contents in a combined route. | An index entry is thin: no current limits, exclusions, detailed terms or buyer-specific acceptance is established. |
For a separate named-perils example, Leadway Assurance company homepage describes a property route but is not an extra insurer. Check the legal entity in NAICOM’s operator directory and obtain current authorisation directly; an entry alone does not certify this product or policy.
A fictional rebuild file · NGN, not a valuation
₦60 million to reinstate is not the same as a ₦48 million limit.
Imagine a completed family building. A measured contractor brief estimates ₦44m for fabric and roof, ₦8m for fixed services, ₦5m for debris removal and ₦3m for professional fees: ₦60m in total. If the owner declares only ₦48m, the nominal difference is ₦12m. That is an under-description question, not a calculated claim shortfall or a promise that all four costs are insurable.
| Cost line | Illustrative amount | Schedule question |
|---|---|---|
| Fabric and roof | ₦44,000,000 | Are structure, foundations, declared outbuildings and the chosen damage event included? |
| Fixed services | ₦8,000,000 | Are attached wiring, plumbing, cooling, gate and solar equipment inside the building sum, separately listed or excluded? |
| Debris removal | ₦5,000,000 | Is clearance included, sublimited or extra to the building sum? |
| Professional fees | ₦3,000,000 | Are architect, engineer and approval costs eligible, and at what limit? |
Land purchase value, removable household contents, lost rent and third-party liability are not in this ₦60m illustration. Market price and mortgage balance are not automatic rebuild values. Ask for the date, method, inflation, average/underinsurance rule, excess and settlement basis before relying on any sum.
Turn a product page into a written comparison
Ask for one schedule that describes this actual building.
| Field | Write down | Why the field changes cover |
|---|---|---|
| Interest and use | Legal insurer, owner, tenant/occupier, lender, premises and residential, let, business or works stage. | An unoccupied or let building is not necessarily rated as an owner-occupied home. |
| Building scope | Fabric, fixed services, gates, outbuildings, solar, works and removable contents separately. | A contents limit or contractor liability certificate cannot silently pay the structure bill. |
| Events and duties | Fire, flood, storm, water, impact, collapse, maintenance/security and any public-building or construction certificate. | Named perils, exclusions and statutory liability may differ by use and location. |
| Valuation | Rebuild estimate date, declared sum, debris/fees, average clause, reinstatement/indemnity basis and excess. | An apparent ₦12m value gap is not itself a settlement calculation. |
| Living and rent | Temporary accommodation or loss-of-rent section, trigger, limit and period if selected. | Leadway’s landlord table publishes loss of rent, but it is not automatic on another issuer’s building policy. |
| Cost and proof | Dated matched NGN premium, fees, taxes, payment dates, certificate and claims/complaints route. | An advertised tier price is not a price for this address or proof of valid cover. |
When damage occurs
Make the site safe; then preserve the cause and cost trail.
- Protect people. Leave an unstable, flooded or electrically unsafe structure and contact appropriate emergency services.
- Limit further damage safely. Keep photographs and receipts for temporary steps; do not start permanent rebuilding before clarifying the insurer’s inspection requirements.
- Notify the actual insurer. Use its verified claims channel, ask for a reference, notice deadline and exact evidence list.
- Describe the loss. Keep title/lease, plans if relevant, event record, dated images, contractor estimates and pre-loss invoices; separate improvements from restoring the prior building.
- Read the written decision. Ask which event, property, interested party, sum, excess and valuation clause controlled. Follow the insurer’s complaints process and then NAICOM complaint guidance if appropriate.
The Guinea Insurance company homepage illustrates works-damage questions, not section 75 liability compliance. A separately indexed NEM fire claim form was not retained as live evidence because its direct URL returned 404 on review; ask your own insurer for its current form.
Nigerian building-cover questions
Is insurance compulsory for every owner-occupied Nigerian home?
Do not assume that. NIIRA 2025 sections 75 and 76 specify construction and public-building triggers. A private owner-occupied home can still need voluntary building-repair cover, but its classification and any local requirement must be checked for the actual premises.
What does section 75 require for a building under construction?
For construction of a building of more than one floor, it requires negligence-related liability protection for bodily injury or loss of life of site workers or the public, procured by owner or contractor after plan approval and before work starts. It is not automatically works-damage insurance.
Can a rented house fall under the public-building rule?
Section 76’s definition includes a building occupied by a tenant, lodger or licensee. Confirm how the actual premises is classified, what certificate is required and which own-building repair section is selected.
Does public-building liability pay to rebuild my walls?
Not by itself. Section 76 addresses specified hazards and owner/occupier legal liability to users and third parties. Ask the insurer to identify any separate first-party reinstatement or fire-perils section.
Does a tenant need to insure the landlord’s building?
Usually ownership and lease determine who has the repair interest. A tenant’s contents policy should not be mistaken for the landlord’s structure policy. Confirm lease duties and named interests in writing.
Are flood, burst pipes and roof leaks the same event?
No. A product page may name flood, water or storm without covering every source of water damage. Ask for the insured event, maintenance duties, exclusions, sublimits and excess.
Are solar panels, gates and a generator part of the building?
Attachment and use matter. Fixed solar, gates and services may be scheduled as structure or specified property; a movable generator may be contents or business equipment. Ask for each item’s classification.
Does a construction policy carry on after occupation?
Do not assume so. Record works-completion, handover and first-occupation dates, and obtain a written transition from construction terms to occupied-building terms.
Is my purchase price the right amount to insure?
Not necessarily. Land value, location, market price and outstanding loan differ from measured reinstatement cost. The fictional ₦60m/₦48m comparison is only a prompt to obtain a current estimate and read the valuation clause.
Are Leadway’s five homeowner and five landlord levels ten policies?
No. They are level tables published by one insurer. The homeowner and landlord interests differ, and none of those rows is an accepted schedule for this property.
Can I rank the ten insurer pages by cheapest premium?
No. They describe unlike policy families and no matched, accepted NGN quotes. The ten sites are research signals, not ten comparable bindable building contracts.
Will this page collect my property or claim documents?
No. It remains public educational with no address, plans, valuation, photographs, identity, quote form, buy button or insurer handoff.